0%

It is easier to prevent a problem than to look for ways to solve it later. Therefore, OV Project Management takes into account all possible financial, technical and physical risks that may arise during the project life cycle, and minimizes them.

This ensures the protection and rational use of resources during the project realization.

Includes

  • Drawing up contracts that take into account all the subtleties and nuances of construction
  • Preparation of construction costs
  • Budget optimization
  • Conducting the necessary feasibility studies